Syark Air force (SAF) - 1/200 Lupa Brand RAAF Airbus Military KC-30B MRRT







Syark Air force (SAF) - 1/200 Lupa Brand RAAF Airbus Military KC-30B MRRT

Good day guys, this month my blog focused in Lahad datu Crisis that cored to OPS Daulat that has been operated by Malaysia Military Forces (ATM). I never forgot to updated my latest scaled model that I has been collected around 3 years ago. RAAF KC30B MRRT is The Airbus A330 MRTT is a military derivative of the A330-200 airliner. It is designed as a dual-role air-to-air refuelling and transport aircraft. For air-to-air refuelling missions the A330 MRTT can be equipped with various  combination system. The A330 MRTT has a maximum fuel capacity of 111,000 kg (240,000 lb) without the use of additional fuel tanks, which leaves space for the carriage of 45,000 kg (99,000 lb) of additional cargo. The A330 MRTT's wing has common structure with the four-engine A340-200/-300 with reinforced mounting locations and provision for fuel piping for the A340's outboard engines. The A330 MRTT's wing therefore requires little modification for use of these hardpoints for the wing refuelling pods.


The refuelling aircraft for the Royal Australian Air Force (RAAF) will be equipped with both an Aerial Refuelling Boom System (ARBS) and two Cobham 905E under-wing refuelling pods. The aircraft are powered by two General Electric CF6-80E engines.[7] Australia was initially to procure four aircraft with an option to obtain a fifth. It has since decided to procure the fifth aircraft to allow for two simultaneous deployments of two aircraft, with the fifth for contingency coverage. Australia's A330 MRTT aircraft will be operated by No. 33 Squadron RAAF based at RAAF Base Amberley. Australia has designated the aircraft KC-30A Multi-Role Tanker Transport.

Upon selecting the A330 MRTT in 2005, the RAAF expected that deliveries would begin in late 2008 and be completed in 2010. Deliveries have since been two years behind schedule, in part because of delays in the development of the boom. On 30 May 2011, KC-30A A39-003, the third converted A330, arrived at RAAF Base Amberley and was formally handed over to the RAAF on 1 June 2011. The second A330 conversion, A39-002 was ferried to RAAF Amberley on 18 June 2011 and handed over to the RAAF on 22 June 2011.[13] In June 2010, Qantas Defence Services announced receipt of the fourth aircraft to its Brisbane facilities, with an anticipated 10-month conversion. The final fifth A330 MRTT aircraft was delivered to RAAF on 3 December 2012.


Thanks for View Guys hahahha

Source : A330 MRTT

Comments